Customization: | Available |
---|---|
Type: | Combination Parts |
Load Capacity: | Heavy Trailer |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tower pipe hauler is special for transporting wind tower. Two clamping frames are used for loading the tower. There are bolt hole on both sides of the lower side of the clamping frame to fixed tower.
There are fixed cargo block above the bolt hole for adjusting the installation position. After tower is fixed, tower is lifted by lifting cylinder.
Our windmill tower pipe hauler has the advantages of simple structure, simple operation, full utilization of existing equipment and space, low manufacturing costand many other advantages. The support body of windmill tower transport trailer has the track for carrying the tower. It is fast and smooth transport, greatly improving the efficiency, saving transportation costs, eliminating the security risks, suitable for the workshop to the storage area of the long distance of the transport.
SL | MODEL | NAME | QUANTITY |
1 | 0ZG0-1000 0ZG0-2000 0ZG0-4000 0ZG0-5000 |
Upper supporting body Supporting sliding seat Lower supporting body Spherical support seat |
4 8 4 4 |
2 | 0ZG0-3000 | Connecting seat | 8 |
3 | 0ZG0-3002 0ZG0-3003 M20-200 20 |
Fixed plate Bushing Inside hexagonal bolt Spring washer |
16 48 48 48 |